Abstract

AbstractThe high level of complexity in modern construction projects causes the problem of scheduling the involved tasks under precedence and resource constraints to be a great challenge. Additionally applications on real construction sites require non linear and non continuous constraints and objective functions. In order to optimize large scale construction sites in practice, this paper proposes a new optimization approach based on creating search trees from swapping and delaying tasks. The convergence of the proposed algorithm is analyzed and its complexity is compared to other available algorithms. (© 2014 Wiley‐VCH Verlag GmbH & Co. KGaA, Weinheim)

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.