Abstract
In many studies in software engineering students are used instead of professional software developers, although the objective is to draw conclusions valid for professional software developers. This paper presents a study where the difference between the two groups is evaluated. People from the two groups have individually carried out a non-trivial software engineering judgement task involving the assessment of how ten different factors affect the lead-time of software development projects. It is found that the differences are only minor, and it is concluded that software engineering students may be used instead of professional software developers under certain conditions. These conditions are identified and described based on generally accepted criteria for validity evaluation of empirical studies.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.