Abstract
Due to the complexity of yard operations and management, a rail-yard operations planning and management tool to support yard capacity and improvement studies is needed. A yard capacity study is to assess how many cars, blocks and trains can be handled with the existing infrastructure and resources. We develop an optimization formulation and a solution procedure for the determination of the capacity of rail yard stations with respect to the optimal number of shunting and reclassification operations at the nodes of the rail network. To tackle this problem, a simulated annealing (SA) algorithm is proposed to solve the model which works efficiently on a neighborhood search within solution space, acceptance probability, and inferior solutions to escape from trap. The proposed approach is applied to an example problem and is shown to be successful, ultimately providing a new managerial tool for planning and analyzing yard capacity more effectively.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.