Abstract
Sea port container terminals play an important role in the national and regional economy. The integrated scheduling of handling equipment has been recently investigated in literature to improve the performance of the container terminals. In this paper, an integrated scheduling of quay cranes and automated guided vehicles is formulated as a mixed integer linear programming model. This model minimizes the makespan of all the loading and unloading tasks for a set of cranes in a scheduling problem. Based on the simulated annealing (SA) algorithm, a scheduling method is proposed to solve the problem in a relatively short period of time. Comparison of the respective results of the mathematical model and the SA algorithm evidently shows acceptable performance of the proposed SA algorithm in finding good solutions for practical scheduling problems. Moreover, the effects of three cooling processes and two sets of control parameters on the best solution of the SA are investigated.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.