Abstract
"Availability-based" contracting originated because customers with high availability requirements are in many cases interested in migrating from buying the actual system to buying the availability of the system. A well-known example of availability-based contracting is Performance Based Logistics (PBL). Prognostics and Health Management (PHM) methods are incorporated into systems to avoid unanticipated failures that can potentially impact system safety, result in additional life cycle cost, and/or adversely affect the system availability. While predicting the availability of a system based on known or predicted system parameters is relatively straightforward and can be accomplished using existing methods; determining the system parameters that result in a desired availability is not and is generally performed using "brute force" search-based methods that become quickly impractical for designing systems with more than a few variables and when uncertainties are present. This paper presents the application of PHM within a "design for availability" approach that uses an availability requirement to predict the required logistics, design (including reliability) and operation parameters with and without the application of PHM methods. A life cycle cost analysis is used to quantify trade-offs of using PHM methods versus more traditional maintenance approaches in the context of availability contracts.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.