Abstract

This study was inspired by the Klang Valley water crisis, for which bank infiltration (BI) is considered a potential solution. This paper presents a case study of the BI techniques, which evaluates the effects of groundwater pumping and BI operation on the installation of wells. This study also determines the effect of pumping rate on flow paths, travel time, the size of the pumping and capture zone delineation, and groundwater mixing in a pumping well in Jenderam Hilir, Malaysia. The proposed method performs infiltration safely and achieves the ideal pumping rate. Numerical modeling packages, MODFLOW and MODPATH (particle tracking) were used. Results indicate that the migration of river water into the aquifer is generally slow and depends on the pumping rate and distance from well to the river. Most water arrives at the well by the end of a pumping period of 1 to 5 days at 3,072 m3/day for test wells DW1 and DW2, and during simultaneous pumping for DW2 and PW1 for a well located 36 and 18 m, respectively, from the river. During the 9.7-day pumping period, 33 % of the water pumped from the DW1 well was river water, and 38 % of the water pumped from DW2 throughout 4.6 days was river water.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.