CSNS(China Spallation Neutron Source) construction is expected to start in 2010 and will last 6.5 years. A long beam transport line is followed with the DTL linac to send the beam a rapid cycling synchrotron (RCS) accelerator. The beam will be focused by the solenoid magnet. This magnet will be located in LEBT system. It has been used with one-dimensional Hall probe to measurement by Institute of High Energy Physics, China. After the measurement, the measurement results meet the design requirements.