Abstract

PurposeThe Project Management Body of Knowledge recommends the use of issue logs as a best practice to minimize the potential project cost and schedule growth. Although the broader topic of project control has been widely studied in the construction literature, the specific application of issue logs has remained relatively understudied. This study aims to analyze the extent and consistency with which construction teams utilize issue logs and the corresponding project performance outcomes.Design/methodology/approachA dataset of 5,635 individual issues was gathered from the final issue logs of 881 small building projects delivered via the design–bid–build method. Differences between groups were determined using the Kruskal–Wallis H test with post hoc testing via the Mann–Whitney U test with pairwise comparison.FindingsThe results showed that, on average, project teams who used issue logs to a greater extent achieved a 3.1 to 4.3% reduction in cost growth and a 5.3 to 12.3% reduction in schedule growth. This result shows that issue logs can be used to improve construction project performance in the areas of cost and schedule.Originality/valueThis result provides a contribution to practitioners, wherein project teams should be encouraged to establish their issue management practices early in the project schedule to encourage greater issue log usage for the remainder of the project.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call