Abstract

Time-cost optimization problems in construction projects are characterized by the constraints on the time and cost requirements. Such problems are difficult to solve because they do not have unique solutions. Typically, if a project is running behind the scheduled plan, one option is to compress some activities on the critical path so that the target completion time can be met. As combinatorial optimization problems, time-cost optimization problems are suitable for applying genetic algorithms (GAs). However, basic GAs may involve very large computational costs. This paper presents several improvements to basic GAs and demonstrates how these improved GAs reduce computational costs and significantly increase the efficiency in searching for optimal solutions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.