Abstract
Despite their advantages, distributed energy resources (DERs) bring inherent uncertainty and variability into the landscape of modern power systems. As DER penetration grows, conventional generators like hydropower plants have to respond more often to arrest the imbalance in the net load. Hydropower turbines provide their best operational performance with minimal wear and tear when operating at regions of maximum efficiency. However, the current needs for hydropower plants require them to operate under varying load conditions and thus sub-optimal operating points leading to additional stress. To relieve the hydropower plants, this paper proposes a hybridization strategy where a hydropower unit is paired with an energy storage system (ESS) to increase operational flexibility and mitigate damage to the hydro plant. Models are developed to represent the operation of the hybrid system, quantify degradation, and assess economic benefits. Moreover, an innovative controller disaggregates the market dispatch signal into separate control setpoints for the ESS and hydropower unit. In case studies performed on a real-world hydropower facility, it was found that the ESS-based hybridization can extend the life of the hydropower plant by 5% on average. The economic benefits from reduced maintenance and deferred investment are estimated to be around $3.6 million.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.