Abstract

We propose an economic electricity reliability planning model which includes customer outage costs (COCs). The objective is to select transmission and distribution (T&D) planning projects which minimize the total costs of providing service in the T&D system. Total costs include both traditional labor and material costs of a T&D project and customer outage costs. We apply this model to evaluate two distribution projects using outage cost data recently collected by Niagara Mohawk Power Corporation (NMPC). We compare the projects selected in this approach to the projects that would have been chosen if outage costs were not used in the analysis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.