Abstract

In the industrial coal boiler, cyclone is used to separate the silica sands (as fluidizing medium) from the furnace combution gas. A gas-solid separation system with turbulent swirling flow that occurs in the cyclone will cause erosion on the cyclone wall. The erosion will cause a decrease in the cyclone performance and increase the maintenance cost. CFD simulation was conducted to predict this erosion using industrial cyclone in the coal boiler industry on its actual dimensions. The dimensions were 5120 mm in diameter and 13970 mm in height. It was performed using the Reynolds Stress Model (RSM) for turbulence flow in the gas phase and the Oka erosion model. The erosion rate on the cyclone wall was investigated at various gas inlet velocity and solid rate. The inlet velocities ranged from 6 to 8 m/s and the solid rates ranged from 30 to 40 kg/s with silica sands as solid particles (0.075 and 1.5 mm in diameter). At the selected local area, the results showed that the higher gas inlet velocity for the same solid rate would increase the erosion rate (about 25%). However, the higher solid rate for the same velocity will also increase the erosion rate on the cyclone wall (about 18%). These results indicate that cyclone wall errosion are significantly affected by inlet gas velocity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call