Abstract

We develop a four-stage, serial supply chain inventory model with planned backorders. This supply chain model is formulated for the integer multipliers coordination mechanism, where firms at the same stage of the supply chain use the same cycle time and the cycle time at each stage is an integer multiplier of the cycle time used at the adjacent downstream stage. We develop an optimal replenishment policy using a simple algebraic method to solve the problem without the use of differential calculus.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.