Abstract

The first stage in the introduction of coal-dust technology has been completed at the blast furnaces at OAO Alchevskii Metallurgicheskii Kombinat, in response to the progressive deterioration in sinter quality and improvement in hot strength of the coke (to acceptable levels of CSR 47–51%). In this stage, the mean monthly dust injection is 124–135 kg/t of hot iron, with complete elimination of natural gas.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.