Abstract

AbstractConstruction project management produces a huge amount of documents in a variety of formats. The efficient use of the data contained in these documents is crucial to enhance control and to improve performance. A central pillar throughout the project life cycle is the Bill of Quantities (BoQ) document. It provides economic information and details a collection of work descriptions describing the nature of the different works needed to be done to achieve the project goal. In this work, we focus on the problem of automatically classifying such work descriptions into a predefined task organization hierarchy, so that it can be possible to store them in a common data repository. We describe a methodology for preprocessing the text associated to work descriptions to build training and test data sets and carry out a complete experimentation with several well‐known machine learning algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.