Abstract
In this paper, we consider the Parallel Machine Scheduling Problem with Additional Unit Resources, which consists in scheduling a set of n jobs on m parallel unrelated machines and subject to exactly one of r unit resources. This problem arises from the download of acquisitions from satellites to ground stations. We first introduce two baseline constraint models for this problem. Then, we build on an approximation algorithm for this problem, and we discuss about the efficiency of designing an improved constraint model based on these approximation results. In particular, we introduce new constraints that restrict search to executions of the approximation algorithm. Finally, we report experimental data demonstrating that this model significantly outperforms the two reference models.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of the AAAI Conference on Artificial Intelligence
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.