Abstract

Abstract This work discusses the problem of selecting methods for valuing the costs and estimating the time of implementing computer systems in cases when system modification is necessary. The methods presented in literature are reviewed and the stages of strategic phase of implementation characterised. On the basis of the analysis of data required by each method and the data obtained at different stages, appropriate selection of methods for each stage was proposed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.