Abstract

The interconnection of the wind generator (WG) and the diesel generator (DG) induces some interactions on the common coupling point. These interactions are studied in this paper with the aim of identifying the system limits in performance and proposing an alternative solution. Due to the fast fluctuations of the WG and the DG slow dynamics, ultracapacitors and batteries are used for improving the hybrid system performances and reducing the fuel consumption. The dc-bus voltage is controlled by the diesel engine while providing a smoothed current. To ensure optimized life cycle cost and performance, a lifetime-estimation-based method is proposed. In this method, a rainflow counting method is applied to size the storage devices by taking into account the actual conditions of the system operation. The experimental test bench is designed in a reduced scale. Some simulations and experimental results are presented and analyzed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.