Abstract

Multiprocessor--Multitask Scheduling problem is very important in running FMS (Flexible Manufacturing System) and is usually one of combinatorial optimization problems which are NP--complete. This paper intends to develop an optimization scheme based on Hopfield Neural Network. By introducing a specific energy function, a Hopfield Neural Network which is suitable to solve the scheduling problem is presented. A brief discussion on dynamic scheduling optimization algorithm is also presented.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.