Abstract

A series of roadway tests strips were paved on-site at a landfill in Florida, U.S. Waste to energy (WTE) bottom ash was used as a partial course aggregate replacement in a hot mix asphalt (HMA) and a Portland cement concrete (PCC) pavement, along with control HMA and PCC sections. This allowed for a comparison of the relative degree of leaching between both materials (HMA and PCC) as well as between the ash-amended and control pavements. Batch and monolithic tank leaching tests were conducted on the pavements. Testing of the PCC samples demonstrated that Mo and Al were elevated above regulatory thresholds for both the control and ash amended samples. Further leach testing demonstrated that the release of Mo was likely from the PCC and not a result of the inclusion of the BA into pavement. Batch leach testing of ash-amended HMA samples revealed Sb as a constituent of potential concern. The results of the monolith leaching test displayed leaching of Sb within the same order of magnitude as the regulatory threshold. Calculation of the leachability index (LI) for Sb found that it would have limited mobility when incorporated in the HMA matrix.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.