Abstract
The use of importance measures to analyze PRA results is discussed. Commonly used importance measures are defined. Some issues that have been identified as potentially limiting their usefulness are addressed, namely: there is no simple relationship between importance measures evaluated at the single component level and those evaluated at the level of a group of components, and, as a result, some of the commonly used importance measures are not realistic measures of the sensitivity of the overall risk to parameter value changes; and, importance measures do not typically take into account parameter uncertainties which raises the question of the robustness of conclusions drawn from importance analyses. The issues are explored in the context of both ranking and categorization of structures, systems, and components (SSCs) with respect to risk-significance and safety-significance for use in risk-informed regulatory analyses.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.