Erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization. The main material used in high-rise construction is insitu reinforced concrete. The technology of its use is directly related to the use of formwork systems. Formwork systems and formwork technologies basically determine the speed of construction and labor intensity of concreting operations. Therefore, it is also possible to achieve the goal of reducing the construction time and labor intensity of works performed by improving the technology of formwork systems use. Currently there are unresolved issues in the area of implementation of monolithic technology projects, and problems related to the selection of a formwork technology, high labor intensity of works, poor quality of materials and structures, etc. are the main ones. The article presents organizational and technological measures, by means of which introduction it is possible to shorten the duration of construction. A comparison of operations performed during formwork installation according to the conventional technology and taking into account the implemented organizational and technological measures is presented. The results of a comparative analysis of economic efficiency assessments are also presented on the example of a specific construction project before and after the implementation of the above mentioned measures. The study showed that introduction of the proposed organizational and technological model taking into account optimization of reinforcing and concreting works significantly improves the efficiency of a high-rise construction project. And further improvement of technologies for the use of insitu reinforced concrete is a promising direction in the construction of high-rise buildings.

Highlights

  • Today erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization

  • Improvement of methods of formwork installation: - rational choice of formwork, including enlargement of shuttering panels into reusable cards with no need to demount them and application of shaft formwork, which shorten the duration of shuttering works - application of coatings eliminating adhesion and the need to lubricate formwork - reduction of the distance of formwork movement by a crane A reasonable approach to choosing a formwork system is an important factor for reducing the period of construction of buildings and structures

  • Use of the latest formwork systems for the implementation of monolithic technology projects contributes to improving the use of technology and construction quality [5]

Read more

Summary

Introduction

Today erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization. It is possible to solve this problem, first of all, by means of introduction of modern technologies and optimization of existing organizational and technological solutions. The potential of mix-in-situ concrete is not used to the fullest extent in Russia. Extention of the scope of its application in high-rise construction is facilitated by the development of new technologies, including creation and implementation of modern formwork systems. It is formwork systems and formwork technologies that basically determine the speed of construction and labor intensity of concreting operations [1, 2].

Methods
Results
Conclusion