Abstract

Deregulation of electric power industries has begun in many countries and power system operations have become more difficult. Therefore, power system operators should consider not only economic load dispatch but also on-line stability aspects. In this paper, we pay attention to one of the most important transient stability indices, Critical Clearing Time (CCT), and propose a new transient stability preventive control method using linear relationships between CCTs and generator rotor angles. A preventive control to achieve a more stable operating point is carried out by generator output rescheduling, which are determined using the relationships between CCTs and generator rotor angles.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.