Abstract

This paper considers three-stage production-inventory systems serving two customer classes, where only one class provides advance demand information and early order fulfilment is acceptable. We propose a new approach for production replenishment and order fulfilment in such systems that uses advance demand information for performance improvement. The approach combines the benefits of early fulfilment and Kanban-based pull systems. Simulation is used to establish the performance of the resulting policy vs. two existing policies, for a variety of production scenarios and cost structures. A lower bound on total cost is also established using a simulation-based procedure. In general, early fulfilment with one-for-one replenishment is shown to provide greater benefit than making items to order. Neither of the existing policies, however, was found to use advance demand information as effectively as the proposed approach, which outperformed the existing policies in every case considered. Additionally, the proposed policy has the advantage of both retaining its benefit at high levels of system utilisation and increasing benefit up to the maximum level of advance demand information provided.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.