Abstract
Abstract A kick simulator was used to plan for well control situations on a deep high pressure well. Results from the simulations were used to identify requirements and modify rigsite well control procedures. The result of the work is safer rig-site operations at little extra cost. Extension of this work to well design in general suggests the potential for safer well operations and simultaneous cost savings.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.