Abstract
Introduction Beijing subway line 14 includes four stations and approximately 2.8 km of tunnels between the Dongfengbeiqiao and Jingshunlu areas of the city. Due to the surface and underground space limitations of this section, a double-track running tunnel instead of two single-track running tunnels was adopted to connect the two stations. The double-track tunnels were excavated by a 10.22 m diameter earth pressure balance (EPB) shield. It was the first time that an EPB shield more than 10 m in diameter was used in Beijing subway construction.Case description The shield, which passes underneath densely built-up areas of the city and is equipped with a spoke-type cutterhead, with balance between the ground pressure and the earth chamber pressure at the tunnel face, is of great importance. Referring to experiences gained in the EPB shield tunneling, attention was paid to the function of soil conditioning and simultaneous backfilling grouting of the shield, and some special designs were considered in manufacturing the machine.Discussion and EvaluationIn addition to the agitating rods welded to the cutterhead, two independently driven agitators were added to fully mix everything in the earth chamber. Independent pipelines were arranged for injecting different conditioning agents. Indoor tests in combination with field tests were conducted to find suitable additives and injection ratios of the additives, and determine the mix ratio of the two-component grout for simultaneous backfilling grouting. A scheme was employed for simultaneously injecting the bentonite slurry at 8% concentration and the foam liquid at 5% concentration to condition the excavated soil. The cement–sodium silicate grout was adopted to fill the tail void and the injection volume per ring was 14.1–15.3 m3.ConclusionsThe performance of the shield and evaluation of the corresponding tunneling technologies are introduced in terms of the shield tunneling induced ground surface settlements. The success of the project is of great significance to Beijing subway construction and underground space utilization. The findings serve as a useful reference for similar projects.
Highlights
Beijing subway line 14 includes four stations and approximately 2.8 km of tunnels between the Dongfengbeiqiao and Jingshunlu areas of the city
Referring to experiences gained in the earth pressure balance (EPB) shield tunneling, attention was paid to the function of soil conditioning and simultaneous backfilling grouting of the shield, and some special designs were considered in manufacturing the machine
The findings serve as a useful reference for similar projects
Summary
Beijing subway line 14 includes four stations and approximately 2.8 km of tunnels between the Dongfengbeiqiao and Jingshunlu areas of the city. The double-track tunnels were excavated by a 10.22 m diameter earth pressure balance (EPB) shield. It was the first time that an EPB shield more than 10 m in diameter was used in Beijing subway construction. Double-track tunnels are constructed using the large diameter earth pressure balanced (EPB) shield tunneling method because of the many advantages it offers over conventional methods. The smooth and rapid construction of the shield tunnel is of great importance for the on-schedule completion of the project. This is explained by use a 10.22 m diameter EPB shield to build the double-track tunnels on Line 14 of the Beijing subway
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.