Abstract
The variants of schematic technical solution of the system of using secondary energy resources - the waste heat of the subway – for the heating of subway stations are proposed, the results of the feasibility study of the heating of the “Nagatinskaya” station of the Moscow Metro with the use of heat pumps are presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.