Abstract

Positive Train Control (PTC) Systems are a type of Communications Based Train Control System (CBTC) designed to enhance railroad safety. As a consequence of a series of high profile train accidents in the United States, a statutory mandate for the installation of these systems in high risk areas by the end of 2015 has been established. This chapter identifies the impetus behind the statute, the statutory requirements associated with PTC, the implementing regulations for the statutory requirements, and the current status of regulatory compliance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.