Abstract
Sizing power transformers in US Navy ships is an issue that surfaced in the design of a new amphibious assault ship. Previous methods averaged the power output from generators over each transformer and calculated load based on a demand factor curve. This technique is not accurate enough in the contract design stages or for zonal architectures since it artificially averages the electrical loads. The proposed methodology uses a systems engineering approach, applying a probabilistic (Monte Carlo) analysis of the electrical loads at each transformer, based on the electrical load analysis (ELA). This methodology will allow the designer to incorporate risk mitigation into a radial or zonal electrical system design to verify adequacy and reduce cost through probability-based transformer sizing.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.