Abstract

The typical U.S. Bureau of Public Roads (BPR) volume-delay function is modified to construct the more suitable model to China’s road traffic situation. Factors influencing road traffic impedance, such as the number of lanes, speed limit, intersection density, bus stop density, saturation and congestion are considered. On the basis of actual data collected from different main roads in Dalian city, traffic impedance functions for different road types (expressway, trunk road, secondary trunk road and slip road) are calculated using SPSS software. The results analysis of the traditional and improved BPR volume-delay functions is compared to certify the useful improved BPR volume-delay function. To apply road traffic impedance to the traditional four-step model, we calculate the daily conversion coefficients. These reflect the relationship between hourly traffic impedance and daily impedance function and suggest the suitable usage of daily conversion coefficients in further research.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.