Abstract

N ow urban rail transit (URT) plan in China has some problems such as inconsistent with urban overall plan (UOP) and urban transportation plan (UTP). According to such condition, trinity system of UOP, UTP and URT plan is advanced, among which URT plan should be focused on and its system structure is researched on from URT development strategy plan and URT overall plan, and URT overall plan is analyzed from network plan and network control plan. Therefore, URT plan is studied and good plan can produce good URT construction so that healthy and sustainable development of URT can be achieved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.