Abstract
AbstractSediment flushing and the morphological responses to the procedure of check dam removal are still unclear. Following laboratory experiments that revealed three stages (deepening, widening, and volume release) of check dam adjustment, a check dam built in 2007 at Landao Creek in central Taiwan was adjusted in 2015 by removing central bars and cutting 2.5 m from the middle two piers (stage 1 + 2), with the purpose of regulating sediment transfer and keeping the thalweg at the center of the channel, while also preventing hill slope toe erosion. In 2019, four central piers were removed (stage 3) to increase the volume of sediment released. Annual surveys were conducted after the initial adjustment in 2015 through to 2020 using unmanned aerial vehicles (UAVs). The check dam adjustments revealed that the channel had narrowed and stabilized as indicated by regenerating riparian vegetation. Additionally, distinct terraces had formed on the hill slope toes of the creek channel in proximity to the check dam. The meander upstream weakened following the dam adjustments. This study combining laboratory experiments with actual field observation contributed immensely to check dam decommissioning. Additionally, this study illustrated how an adjustable check dam may aid regulation of sediment transport and thereby sediment balance. It can be adjusted accordingly based on the prevailing channel condition.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.