Abstract

<p>To deal with the high volume of traffic in the historic city center of Karlsruhe (Germany), the track system of the historic surface tram is moved underground.</p><p>First, seven underground stations are built, which are then connected by using a tunnel boring machine for excavation of the tracks. While the traffic continues on the surface, the new underground stations are being built in sections using the dig-and-cast construction method. Due to the high ground water level bore piles and diaphragm walls of reinforced concrete / concrete cut-off wall are used as excavation pit shoring. A grouted sealing blanket made using jet grouting processes serves as horizontal blanket.</p><p>The cover is made while the traffic continues overhead, to this end traffic routing of road and tram traffic is altered in several stages of construction. The subsequent removal of the soil is realized via this newly created tunnel system – this way no truck traffic has to pass through the city center.</p><p>The construction is a challenge to permit a limitation of the deformations in relation to the settlement of the immediately adjacent historic buildings and also in the logistics of the construction while keeping the traffic above ground running.</p>

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.