Abstract

The vertical uplift resistance of interfering pipelines buried in sands has been computed using the lower-bound limit analysis in conjunction with finite elements and nonlinear optimization. The soil mass is assumed to follow the Mohr-Coulomb failure criterion and an associated flow rule. It is specified that all the pipes fail simultaneously at the same magnitude of the failure load. For different clear spacing (S) between the pipes, the magnitude of the efficiency factor (xi(gamma)) is determined. Because of pipes' interference, with a reduction in the spacing between the pipelines, the magnitude of xi(gamma) is found to decrease continuously. The results were found to compare quite well with the available data from literature for horizontal strip anchors. (C) 2015 American Society of Civil Engineers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.