Abstract
Kuwait transmission network (275 kV network) has a significant increase in short circuit level at some grid and power stations substations above the system limitations (80 % of the rupture capacity of the system 63 kA).This increase results from the growth of power demand and the increase of transmission network complexity. New power stations will be added in the next few years. This paper describes a solution to the problem by splitting the transmission network into three zones as well as constructing new high voltage transmission network (i.e. 400 kV) and connects it with the existing 275 kV network. All the new power stations must be connected to the new 400 kV network and the connection to the 275 kV network must be stopped
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Advances in Scientific Research and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.