Abstract

This article discusses a project being carried out in the BOF shop at the Chelyabinsk Metallurgical Combine to describe the experience of upgrading teeming cranes and increasing their load-carrying capacity. The cost of the upgrades was minimized by maximizing the use of the existing equipment and minimizing expenditures on equipment disassembly and assembly, commissioning, and startup.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call