Abstract
Measures taken to develop and put into operation three new exterior channels for emergency process water with two additional 60VTs pumping units, which remain operational even during an earthquake and were installed in the second block pumping station, are described. In addition, the three existing 12NDS horizontal pumping units were used as a basis to develop a third channel for the emergency process water. Above-ground water ducts with thermal insulation and heating systems to prevent freezing during the anticipation state, which is the constant state of the emergency system, were laid. As a result of upgrading with the development of three channels, the emergency process water feeding reached an adequately safe level of reliability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.