Abstract

<p>For the bridge maintenance strategy and planning, prediction of future performance based on the current performance must be required and it is possible more rational decision-making through the higher accuracy of the prediction model. While performing a detailed inspection of the entire bridge can reduce a significant part of the uncertainty, it is impossible to reduce the uncertainty of inspection result and it is always evaluated by probability. In this study, to solve this problem, a Bayesian update method is applied to the optimal maintenance strategy in Bridge Management System (BMS) considering the uncertainty of inspection data. Also, examples of application are presented, showing the effects of inspection and updating on the bridge maintenance strategies. In this study, application possibility and availability of domestic bridge management system are evaluated by referring to the proposed method in the existing trends.</p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.