Abstract

Proton Improvement Plan II (PIP-II) is the future plan for upgrading the Fermilab proton accelerator complex to a beam power capability of at least 1 MW delivered to the neutrino production target. A room temperature section accelerates H⁻ ions to 2.1 MeV and creates the desired bunch structure for injection into the superconducting (SC) linac. SC linac using five cavity types. One 162.5 MHz half wave resonator, two 325 MHz spoke resonators and two 650 MHz elliptical 5-cell cavities, provide acceleration to 800 MeV. The EM design of the second family of spoke resonator is presented in this paper. The work reported is a thorough electromagnetic study including: the RF parameters, multipacting mitigation and transverse field asymmetry. The cavity is now ready for structural design analysis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.