Abstract

This paper addresses the problem of scheduling jobs on unrelated parallel machines with eligibility constraints, where job-processing times are controllable through the allocation of a nonrenewable common resource, and can be modeled by a linear resource consumption function. The objective is to assign the jobs to machines and to allocate resources, so that the makespan is minimized. We provide an exact formulation of the addressed problem as a mixed integer programming model. In view of the computational complexity associated with the formulation makes it difficult for standard solvers to deal with large-sized problems in reasonable solution time, two ant-colony optimization algorithms based on distinct procedures, respectively, are also presented and analyzed. Numerical results show that both the proposed algorithms are capable of solving industrial-dimensioned problems within reasonable computation time and accuracy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.