Abstract
A number of approaches have been proposed in tackling the timetabling problem, such as operational research, human-machine interaction, constraint programming, expert systems, and neural networks. However, there are still several key challenges to be addressed: easily reformulated to support changes, a generalized framework to handle various timetabling problems, and ability to incorporate knowledge in the timetabling system. In this article, we propose an automatic software engineering approach, called task-based conceptual graphs, to addressing the challenges in the timetabling problem. Task-based conceptual graphs provide the automation of software development processes including specification, verification, and automatic programming. Maintenance can be directly performed on the specifications rather than on the source code; moreover, hard and soft constraints can be easily inserted or removed. A university timetabling system in the Department of Computer Science and Information Engineering at National Central University is used as an illustrative example for the proposed approach. © 2005 Wiley Periodicals, Inc. Int J Int Syst 20: 1137–1160, 2005.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.