Abstract

The rebuild of the Vaxjo Varnamo Biomass Gasification Center (VVBGC) integrated gasification combined cycle (IGCC) plant into a plant for production of a clean hydrogen rich synthesis gas requires an extensive adaptation of conventional techniques to the special chemical and physical needs found in a gasified biomass environment. The CHRISGAS project has, in a multitude of areas, been responsible for the research and development activities associated with the rebuild. In this paper the present status and some of the issues concerning the upgrading of the product gas from gasified biomass into synthesis gas are addressed. The purpose is to serve as an introduction to the scientific papers written by the partners in the consortium concerning the unit operations of the process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.