Abstract

The unit commitment problem (UCP) is a nonlinear mixed-integer optimization problem, encountered as one of the toughest problems in power systems. The problem becomes even more complicated when dynamic power limit based ramp rate constraint is taken into account. Due to the inadequacy of deterministic methods in handling large-size instances of the UCP, various metaheuristics are being considered as alternative algorithms to realistic power systems, among which genetic algorithm (GA) has been investigated widely since long back. Such proposals have been made for solving only the integer part of the UCP, along with some other approaches for the real part of the problem. Moreover, the ramp rate constraint is usually discussed only in the formulation part, without addressing how it could be implemented in an algorithm. In this paper, the GA is revisited with an attempt to solve both the integer and real parts of the UCP using a single algorithm, as well as to incorporate the ramp rate constraint in the proposed algorithm also. In the computational experiment carried out with power systems up to 100 units over 24-h time horizon, available in the literature, the performance of the proposed GA is found quite satisfactory in comparison with the previously reported results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.