Abstract

The problem of scheduling a set of unit-time jobs on m uniform machines is studied. Some jobs may require a unit of an additional single resource during their execution. The resource is renewable but the total resource consumption is limited by the same value at each time instant. The objective is to find a feasible schedule minimizing the maximum job completion time. We show that an approach suggested in the literature to solve this problem is incorrect. Then we present an O( m log m) algorithm for the problem with no machine idle times and a linear-time algorithm for the problem with identical machines.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.