Abstract
This paper considers a continuous-time bidimensional renewal risk model with subexponential claims. In this model, the claim size vectors and their inter-arrival times form a sequence of independent and identically distributed random vectors following some general dependence structures introduced by [T. Jiang, Y. Wang, Y. Chen and H. Xu, Uniform asymptotic estimate for finite-time ruin probabilities of a time-dependent bidimensional renewal model, Insur. Math. Econom. 64 (2015), pp. 45–53.]. We not only extend the results of [T. Jiang, Y. Wang, Y. Chen and H. Xu, Uniform asymptotic estimate for finite-time ruin probabilities of a time-dependent bidimensional renewal model, Insur. Math. Econom. 64 (2015), pp. 45–53.] under some weak conditions, but we also obtain an asymptotic estimate of the finite-time sum-ruin probability. Furthermore, when the distributions of claim sizes have nonzero lower Karamata indices, some explicit asymptotic formulas are established for the infinite-time ruin probabilities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.