Abstract

Abrief information about Chiryurt hydroelectric station located in the Republic of Dagestan is presented. The complex value of the derivation channel of Chiryurt Hydro Power Plant (HPP)-1 for the Republic and the problems of its operation at the present time are described in detail. A comparative assessment of various options for canal reconstruction is given, considering the need for the operation of the waterworks during reconstruction and the minimization of social tension risks in the region. The conclusion is made about the optimal variant of reconstruction that provides a reliable and safe operation of the hydroelectric station.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.