Abstract

The currently popular approach to a direct determination of the specific breakage rate of particles of a given size in the ball milling operation involves: (i) using material crushed in jaw/roll crushers as the starting feed charge, (ii) batch grinding in four–five steps for a total period of 4–8 min, and (iii) determining the slope of the best-fit straight line of a log-linear ‘first-order disappearance kinetics’ plot. In this paper, using published data on grinding of the mixtures of minerals, and effect of the mill operating variables on grinding kinetics, it has been shown that this approach is not quite suitable for carrying out a meaningful analysis of the grinding operation as the specific breakage rate of particles varies quite significantly during the period of grinding covered in the test work. It has been emphasized that the disappearance kinetics of the crushed particles as a top size should not be of any concern to us for the purpose of design and scale-up. It is the instantaneous specific breakage rate of particles produced in the test ball mill under the operating conditions of interest that needs to be determined.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.