Abstract
Recent critiques of the BIM literature describe it as largely devoid of critical theoretical perspectives and theorization capable of explaining the nature of change in work practices in a holistic manner. In response, the authors argue that, from a theoretical standpoint, implementing BIM within professional work practices (as activity systems) induces their evolution through dysfunctions created within the systems and their resolution. Cases of professional organizations in South Africa that have implemented BIM within their organization and in multi-organizational projects helped to develop new theoretical insights into how professional work practices evolve using activity theory-based re-description of the data. Changes in professional work practices were analyzed sequentially within the framework, confirming theoretical propositions and revealing the dynamics between and within the interconnected system of actors, their object, tools, rules guiding work, roles they assume and the stakeholders. Essentially, the findings imply that the implementation of BIM significantly changes work practices within organizations, but gradually and over time. This supports an evolutionary, rather than a radical or revolutionary, view of BIM-induced change. This theoretical perspective could explain future dimensions of change in professional work practices involving BIM, and indeed similar work mediating tools.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.