Abstract

Engineering large industrial construction projects is usually a complex task involving several co-operating actors. This paper investigates a specific type of such projects, labelled bi-project management. Bi-project management is characterised by two main actors, each of whom manage a part of the project: the owner of the installation (the client organisation) responsible for the engineering of the production process part, and an engineering office responsible for the construction related part. This paper describes and analyses what an engineering office can do to improve control of its part of the project, knowing that its part must be completed in advance; in addition, it is dependent on the client's part and must adapt to any changes the client may make. A framework for analysis and control has been developed, which distinguishes four areas. Two areas (key documents and basic interaction structure) are based on normal project control practices. The two remaining areas have been added to deal with the technological uncertainty and planning structure of the client organisation. The framework helps elucidate the specific nature of bi-project management. Effective bi-project management should not only apply normal project management practices, but also anticipate risks and postpone work to the last possible moment. A main topic for future research is to identify the underlying causes for uncertainty in these types of projects.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call