Abstract
The paper summarizes the excavation methodology, based on analysis of the characteristics of the surrounding rock mass, which has been involved in Xiaolangdi multipurpose dam project. Some special support and excavation methods, such as twin side drift and lattice girder, moderate blasting and double-layer mesh to collapsed tunnel and fault zone, are presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.